Our Construction Projects

Stock Island Marina Village

General Contractor
Project consisted of the construction of a high end marina complex complete with infrastructure for future development. Stock Island Marina Village is located on Stock Island and has received many awards and accolades for its level of hospitality and service.
http://stockislandmarina.com/

Key Haven to Big Coppitt Heritage Trail

General Contractor
Project consisted of the construction of over 3 miles of bike path, with concrete retaining walls and landscaping. The trail offers direct access to many points of interest in and provides safe passage for pedestrians looking to see what the Keys has to offer.
http://www.dep.state.fl.us/gwt/state/keystrail/_default.htm

Sugarloaf Wastewater System

Subcontractor
Project consisted of the installation of over 22,000 linear feet of sewer pipe in the Sugarloaf area, as well as over 8,000 linear feet of water lines. This project was a portion of the Cudjoe Regional Wastewater Collection System, aimed at reducing the environmental impact of wastewater collection in the Keys.
http://cudjoewastewater.com/

Oceanside Marina Complex Demolition

General Contractor
Project included the demolition of over 50,000 SF of commercial buildings and structures on the marina complex, which was self-performed by Charley Toppino and Sons.

Key West Hotel Collection Projects

Subcontractor
Project consisted of demolition, underground utilities, and earthwork at 4 sprawling hotel sites on Roosevelt Blvd in Key West. Charley Toppino and Sons was able to provide site development services to each of the 4 hotel sites within the collection.
http://www.gateshotelkeywest.com/

City of Key West Fire Station #2

Subcontractor
Project consisted of the installation of drainage systems, injection well, utilities and earthwork. The City of Key West Fire Station #2 was official opened in January of 2014.
https://www.cityofkeywest-fl.gov/

CVS Stock Island

Subcontractor
Project consisted of the installation of over 22,500 Tons of fill material, as well as underground utilities and concrete flatwork.
http://www.cvs.com/

FDOT Summerland Key Drainage Project

General Contractor
Project consisted of the installation of over 3,000 linear feet of drainage systems, 1,200 tons of asphalt paving on US1 and concrete flatwork.
http://www.dot.state.fl.us/

FKCC Marine Technology Building Demolition

General Contractor
Project consisted of the demolition of an 8,000 SF concrete structure and removal of over 4,000 tons of fill material and demolition debris.
https://www.fkcc.edu/

DEP: Spanish Harbor Heritage Trail Project

General Contractor
Project consisted of the construction of over 9 miles of bike path, with concrete retaining walls and landscaping. The trail offers direct access to many points of interest in and provides safe passage for pedestrians looking to see what the Keys has to offer.

 http://www.dep.state.fl.us/gwt/state/keystrail/_default.htm

North Simonton Street Emergency Outfall

General Contractor
Project consisted of electrical system upgrades and the installation of over 300 linear feet of 36” PVC storm pipe. The system was added to diminish storm water impacts in the Simonton/Front street area. 

https://www.cityofkeywest-fl.gov/

FKCC Marine Technology Building DemolitionSouthernmost Cabana Resort Project

Subcontractor
Project consisted of the installation of a complete sewer system and water system, as well as earthwork and grading.

 http://southernmostcabana.com/

Tarpon Harbour Project

Subcontractor
Project consisted of the installation of over 20,000 tons of fill material, and the installation of fire, water and sewer systems for the development.
http://www.tarponharbourapts.com/